Rubikon specializes in designing and installing turnkey solar photovoltaic (PV) systems, with optional battery energy storage (BESS), specifically for transport hubs, sports facilities, and public infrastructure. Our focus is on maximizing self-consumption, achieving zero-export, ensuring stable power quality, and providing backup for critical systems, so your facility can remain operational without relying on noisy generators.

Who this is for

Transport Hubs
  • Bus stations and intercity terminals
  • Depots and terminal infrastructure
  • Buildings with ticketing, platforms, exterior lighting and parking areas
Sports Facilities
  • Pools and aquatic centers
  • Stadiums and arenas
  • Fitness clubs and sports complexes
Public & Municipal Facilities
  • Administrative and community buildings
  • Facilities with 24/7 safety requirements
  • Public buildings sensitive to outages and voltage instability
What Problems We Solve
  • Power outages disrupting public services
  • Failure of critical systems: ticketing, displays, announcements, pumps, ventilation, IT
  • Voltage instability damaging electronics and control systems
  • Peak loads increasing electricity bills
  • Rising and unpredictable tariffs
  • Dependence on generators, fuel logistics and maintenance

Solutions by Facility Type

Transport Hubs (Bus Stations, Terminals, Depots)  

These facilities are designed to ensure that ticketing systems, schedule displays, announcements, CCTV, and exterior lighting remain operational during power outages.  

Typical Setup

Rooftop or facade-mounted photovoltaic (PV) panels combined with a 3-phase inverter, zero-export capabilities, and a battery energy storage system (BESS) dedicated to critical lines.

Sports Facilities (Pools, Stadiums, Gyms)  

These facilities are optimized to manage high daytime energy loads from heating, pumps, ventilation, and lighting systems. 

Typical Setup

PV systems sized to meet peak usage, along with BESS backup for essential operations.

Public & Municipal Buildings 

These installations prioritize reliability, safety, and predictable energy costs.  

Typical Setup

Either PV-only systems for cost savings or hybrid systems that combine PV with BESS to prevent downtime.

PV-only vs. Hybrid (PV + Battery Energy Storage System)

PV-only (On-Grid)

  • Ideal for areas where outages are infrequent  
  • Maximizes savings through daytime energy generation  
  • Lower initial investment required  

Hybrid (PV + Battery Storage)

  • Maintains critical services during power outages
  • Allows for peak shaving and load prioritization
  • Protects sensitive electronics from power fluctuations
  • Reduces reliance on backup generators 

What Can Be Run On Backup Energy Storage Systems (BESS)

  1. Transport hubs
  2. Ticketing and payment systems
  3. Display and announcement systems
  4. CCTV, access control, and emergency lighting
  5. Networking and dispatch systems
  6. Sports facilities
  7. Emergency lighting and security
  8. Pumps and filtration systems (priority lines)
  9. Ventilation and control systems
  10. IT and administration services
  11. Public buildings
  12. Emergency lighting and safety systems
  13. IT, communications, and networking services
  14. Selected essential circuits

Note: The backup duration is dependent on the capacity of the BESS and the prioritization of loads.

How We Work

  1. Initial consultation and energy usage review
  2. On-site inspection and system assessment
  3. Technical design and cost modelling
  4. Installation scheduled around academic calendars
  5. Monitoring, maintenance, and support

Why Choose Rubikon

  • 50+ energy projects delivered
  • Proven experience with 10-500 kW+ systems
  • Engineering-first approach (load profile + electrical reality, not “generic kits”)
  • Financing strategy support
  • Technical audit and tailored system architecture
  • Quote in 24 hours, quick installation
  • Turnkey EPC: design → installation → support
  • Transparent pricing: fixed budget, no hidden costs

FAQ

Yes, we create selective backup scenarios for priority circuits.

Yes, we phase the work to avoid any downtime.

No, photovoltaic (PV) systems can often work independently where outages are rare. However, battery energy storage systems (BESS) are recommended in locations where downtime impacts safety or service.

We integrate our systems into roofs, façades, and carports to maintain the building’s architectural integrity.